Hilton Nigeria Phase II Design a Replacement for old cooling towers with a total capacity of 2400 Tons with new cooling towers fitting the site unique criteria. The new cooling towers were designed with an industrial type control system to insure best operation management.
King Abdul Aziz International Airport, DC Plants with total cooling capacity of approximately 218,000 TR. This capacity is divided into four phased DCPs: Load Center A with 15,000 TR (Complete Capacity 30,700 TR), Load Center B with installed 50,000 TR (Complete Capacity 90,700 TR), Load Center C with installed 45,000 TR (Complete Capacity 56,800 TR), and Airport City DCP with installed 40,000 TR (Complete Capacity 40,000 TR).
Detailed Process ,HVAC design and tender evaluation for Dalma Mall chiller Plant,with total capacity of 10,000 TR. Conneting to 4 existing energy transfer stations allocated inside the mall.
The Saline Water Conversion Corporation (SWCC) is developing a new combined cycle power and desalination plant in Ras Al Zour in the eastern province, in Saudi Arabia. The power plant will have a design capacity of 2,400 megawatts (MW) but will be able to generate 2,750 MW of electricity. The desalination plant will produce up to 1.025 million liters of water each day, making it the world's largest desalinization plant when it is completed in 2014. The purpose of the project is to meet the national power demand and supply power to Maaden's aluminium complex. DCPRO’s scope of our work is the mechanical design of the 10,000 tons chiller plant, and the full HVAC design of 19 non-plant building with 42,000 m2 built up area, 16 plant buildings and the Ventilation Design for 5 Steam turbine buildings combined cycle, 5 Gas Turbine buildings with combined cycle and for 1 Gas turbine hall single cycle.
Surge Analysis for the Chilled Water Networks at PTB (414 chiller plant) and NDA (714 chiller plant) of total networks size of 13 km at Muscat Airport District Cooling Scheme. The analysis included the detailed study and suitability of the available suge tanks with three different simulations for each network.
KSU Endowment, DC Plant with total cooling capacity of 21,000 TR. This capacity is divided into 15,000 TR for phase I and the remaining 6,000 TR for future phasing based on the cooling load demands of the plots and the buildings it serves. The piping network sized for the full capacity of 21,000 TR. The network shall consist of two-pipe system installed in a tunnel routed to distribute chilled water from the plant room to various loads.
Detialed engineering design and construction supervision for Nation Towers district cooling plant, chilled water piping and Energy Transfer Station of total capacity 12,500 TR.
Full technical, operation & maintenance and financial evaluation of Palm District Cooling Assets consisting of 18 district cooling plants and 8 chilled water networks with total planned cooling capacity of 714,000 TR. The financial evaluation assessed the current value of each DC plant and network based on installed equipment, equipment conditions and depreciation and performed a payback analysis based on the total revenues, operational cost, connected load and forecasted loads.
Rihan Heights Design review report of the existing Mechanical, Electrical, Civil and Architectural design and layouts of the 5,000 TR plant room ,prepare the heat loss and pressure drop calculations for the reticulation network, ensure the compliance with Abu Dhabi authorities requirements including all design and shop drawings and finalizing all NOCs and authority approvals, and construction support and coordination that shall support the contractor throughout the construction and authority approvals period.
Detialed engineering design and construction supervision for ADNEC district cooling plant, chilled water piping and Energy Transfer Stations of total capacity 30,000 TR.
Detailed engineering design and construction supervision of Al Sowwah Island district cooling plant of total capacity 80,000 TR and 20 MW standby power generation
Detailed MEP building services design for residential towers located in Al Reem Island in Abu Dhabi. The projects consist of 4 shared basement floors & two towers of 42 &62 floors with total built up area 2274,000 sq m (2'950'000 sq.ft).The project will also contain villas and retail at podium floors
Engineering design review and partially re-design for the major areas and MEP systems in parallel with site construction process providing best engineering solutions and power-consumption saving ideas. The project is the 5-stars Palazzo Verssace hotel (3B+G+10 Typ.) and 77-storey D1 Tower with a total built up area of 241'000 sq m (2'600'000 sq ft) with all related facilities and services and is located in Dubai Business Bay near to Burj Dubai.
District cooling assessment, value engineering, chilled water piping detailed design, Energy Transfer Stations technical connection guide, preparation of concession agreement, service agreement, and BOO invitation to tender for Saadiyat Island
Remedy of defects in Dubai Mall HVAC and Ventillation design and installation to meet comform conditions and resolve indoor air quality problems encountered in Dubai Mall where DC PRO where involved in solving critical problems in the Mall's system design and installation errors and managed to improve the indoor air conditions.
Detailed design and construction supervision for Dalma Mall District Cooling Plant, chilled water piping and energy transfer stations of total capacity 30,000 TR.
Masdar City ultimate green District Cooling Concept design comprising of three plants each of 25,000 Ton capacity inclusive deep geothermal energy harvesting, Concentrated trough solar collector, centralized liquid dessicant distribution and regeneration, centralized hot water network for solid dessicant regeneration, double and tripple effect absorption chillers, ultra high efficiency electric centrifugal chillers, chilled water and hot water thermal storages, distribution network, etc.
Engineering Reviews and Construction Support for The Wave District Cooling plant of total capacity 20,000 TR, distribution network and energy transfer stations.
Detailed MEP building services design for Al Lusaily for design of mechanical, electrical and plumbing design. Al Lusaily is an approximately 1,100 acre master planned Community within the Jebel Ali Area of Dubai. Al Lusaily will have over 35,000 residences with a net land area of 203,067 m2
Detailed MEP building services design for Crystal City for design of mechanical, electrical and plumbing design inclusive of related infrastructure and a 6,000 TR District Cooling Scheme. The development is 140,000 m2 in total, out of which is 60,000 m2 for hotel and 50,000 m2 for residential, 30,000 m2 for parking
Detailed MEP design for Ajman Markets Cooperative Society, with total built-up area of 9,000 m2. It consists of a hypermarket and retail shops with a built-up area of 5,000 m2, in addition to parking facility of 4,000 m2. The cooperative society opted for on-site power co-generation utilizing diesel fuel in a CHP system used to supply the entire facility with cooling load. Hybrid HVAC, refrigeration, and monitoring systems have contributed to creating a landmark for energy efficient hypermarkets in the region.
Detailed MEP building services design & supervision for the 24-storey 5-star Kampala Hilton hotel in Uganda. The total project has a total built up area of 32,000 m2 covers 272 rooms and some of most majestic fixtures and recreational facilities in the hotel industry. A 500-metre square ballroom, spas, beauty salons, swimming pools, business centre and large garden pools will provide guests with an unforgettable experience.
Detailed HVAC design and site supervision for Gulf Pearl tower in Sharjah. The project has a total built up area of 580,000 ft2 and have a new HVAC system based on water source air-conditioners
Engineering Design review for Tameer's Towers –Abu Dhabi project in Shams, Al Reem island in Abu Dhabi. The Development is divided into residential and commercial sites, totaling approximately 10 million ft2. The iconic Tameer towers has received six prestigious accolades from the CNBC Arabian Property Awards 2008
Detailed MEP building services design & supervision for the mixed-use development project. Podium-Dubai high rise office Tower at MAJAN and Eye Park - Dubailand that comprise of six (6) high rise residential towers at ARJAN. The total project has a total built up area of 4.4 million ft2 built in 500 thousand square feet developed by Mizin real estate. The project in will contain retail areas with full amenities, ample parking and a shopping gallery.
Detailed Green Building Services and District Cooling Plant engineering design, Construction management and Supervision for the Business Boulevard Project for a total of 7,000,000 ft² area used for residential, retail and office applications and 15,000 TR District Cooling Plant, piping and Energy Transfer Stations.
Detailed Engineering Design for the chilled water network in Water Front Project, G9 Precinct of total capacity 68,000 TR and consisting of 20 KM of GRP piping.
Detailed Engineering Design for Bay La San Development, King Abdulla Economic City for 2 district cooling plants, distribution network and Energy Transfer Stations of total capacity 78,000 TR.
Design Review, Evaluation and QA/QC Assistance for Muscat Airport District Cooling Scheme. Detail Thermal Storage Design for 2 Tanks and surge analysis for external chilled water piping.
District Cooling concept design, assessment and study, and Chilled water piping detailed design for Dubai Golf City Project, Dubai Land, of total capacity 42,000 TR.
Engineering design, Construction Management and Supervision for Sharjah Investment Center district cooling plant of total capacity 120,000 TR and chilled water distribution network consisting of 44 KM CS piping network.
Engineering design, Construction Management and Supervision for Al Reef Down Town District Cooling Plant of total capacity 8,000 TR, Energy Transfer Stations and chilled water distribution network.
Engineering design, Construction Management and Supervision for Building Material City District Cooling Plant of total capacity 30,000 TR, Energy Transfer Stations and chilled water distribution network consisting of 6 Km CS piping network.
Engineering design, Construction Management and Supervision for Danet Abu Dhabi's District Cooling Plant of total capacity 37,500 TR, Energy Transfer Stations and chilled water distribution network consisting of 6 Km CS piping network.
Engineering design for Worker's Village district cooling plant of total capacity 12,500 TR and chilled water distribution network consisting of 6.5 Km CS & HDPE piping network
Construction management & Supervision for Motor City District Cooling Plants 1 & 2 of total capacity 92,000 TR, 23 Energy Transfer Stations and chilled water underground piping network consisting of 50 Km CS & HDPE piping network.